1
/
of
3
Barrier post, semi-automatic lowering, hot dip galvanised.
Barrier post, semi-automatic lowering, hot dip galvanised.
Prices exclude VAT. VAT will be calculated at checkout.
Regular price
€769.00
Regular price
Sale price
€769.00
Shipping calculated at checkout.
Estimated delivery: 39 days
Barrier post, semi-automatic lowering, hot dip galvanised
- Supplied = assembled
- Height = 2050 mm
- Height above ground = 900 mm
- Post dimensions = 76 mm
- Material = steel
- Finish = hot dip galvanised
- Post colour = hot dip galvanised
- Design = can be lowered
- Type of mounting = for setting in concrete
- Mounting = with ground sleeve
- Place of use = indoor and outdoor use
- Design of head = flat head
- Depth below ground = 1150 mm
- Tube form = round
- Lock type = triangular utility lock
- Weight = 22 kg
- Product type = bollards/barrier posts made of steel
- Customs tariff number = 73089098
- Country of origin = DEU
- Gross weight = 22.8 kg
- Weight = 22 kg
- For the temporary release of traffic areas
- Hot-dip galvanised quality steel
- Easy installation
- With ground sleeve for setting in concrete
- Upper part can be easily replaced
- This barrier post is an elegant solution for when access roads, paths or restricted areas need to be temporarily opened up, without creating a tripping hazard once the barrier is removed
- Ideal for pedestrian zones, market squares, car parks, garage driveways, archways etc
- The post can be retracted in seconds using a surface hydrant key in accordance with DIN 3223: Traffic can then roll unhindered over the ground sleeve, which is concreted in almost flush with the surface
- Overall height 2050 mm, of which 1150 mm is below ground
- Diameter: upper section: 76 mm, lower section: 100 x 100 mm
- Easy to install
- The upper section can be replaced if damaged
- Semi-automatic: After being unlocked with the triangle key, the gas pressure spring automatically raises the upper section from the ground sleeve
- After being raised slightly, the post locks automatically
- The unlocked upper section is lowered simply by pushing it down
- Installation note: ensure proper drainage (fill with gravel)
- The PARATlift may not be installed in standing water (e.g. ground water)
- Maintenance: important for flawless function
- Remove any dirt that has accumulated, clean all moving parts and grease the locking hook at least every six months.
Share
Quantity
Couldn't load pickup availability
